TEKTRONIX A1006 Adapter Dual Long Lead Transistors 5 Pin

Inquire for pricing
Service & PurchasePriceSelect
Standard calibration to manufacturers specifications.$150.00
Calibration including pre and post calibration data.$200.00
Calibration with 17025 accreditation.$239.00
Equipment repair to manufacturers specifications.Inquire for pricing

SKU TEKTRONIX A1006 Category Manufacturer Model Number

Service Request


Laboratory Calibration

Micro Precision operates 36 laboratories globally providing reliable localized support

  • Certified metrologists staffing laboratories in North America, Central America, South America, Europe, Asia, and the Middle East
  • Comprehensive scopes of accreditation to meet a broad range of customer needs
  • Expedited calibration services available
  • Pickup and delivery services available
  • Environmentally controlled facilities to ensure high quality and accurate calibrations and measurements.
instrument-calibration-services
Calibration Service For This Equipment

Laboratory Calibration

Micro Precision operates 36 laboratories globally providing reliable localized support

  • Certified metrologists staffing laboratories in North America, Central America, South America, Europe, Asia, and the Middle East
  • Comprehensive scopes of accreditation to meet a broad range of customer needs
  • Expedited calibration services available
  • Pickup and delivery services available
  • Environmentally controlled facilities to ensure high quality and accurate calibrations and measurements.
Calibration Service For This Equipment
instrument-calibration-services

Quality Certified Test Equipment Repair Services

When a piece of equipment fails you have the option to repair or replace that item. Oftentimes repair is an economical and efficient solution. Micro Precision’s repair offering provides advantages to our customers:

  • Cost effective; often less than OEM
  • Efficient; often much better turn-time than the OEM
  • Flexibility; willingness to work with customers to meet their needs
  • Warranted repairs
  • Ability to service many obsolete instruments
electroinics-equipment-repair
Repair Service For This Equipment
electroinics-equipment-repair

Quality Certified Test Equipment Repair Services

When a piece of equipment fails you have the option to repair or replace that item. Oftentimes repair is an economical and efficient solution. Micro Precision’s repair offering provides advantages to our customers:

  • Cost effective; often less than OEM
  • Efficient; often much better turn-time than the OEM
  • Flexibility; willingness to work with customers to meet their needs
  • Warranted repairs
  • Ability to service many obsolete instruments
Repair Service For This Equipment

Cost Effective Test Equipment Options

From the leasing of specialized electronic equipment for a specific task, to the purchase of physical and dimensional tools, we offer leasing services as well as used test equipment sales. We also locate hard-to-find electronics, and provide flexible options to meet ever-changing equipment needs.

used-test-equipment-sales-rental
Rent or Purchase This Equipment

Cost Effective Test Equipment Options

From the leasing of specialized electronic equipment for a specific task, to the purchase of physical and dimensional tools, we offer leasing services as well as used test equipment sales. We also locate hard-to-find electronics, and provide flexible options to meet ever-changing equipment needs.

Rent or Purchase This Equipment
used-test-equipment-sales-rental

Our Capabilities

Micro Precision can perform instrument calibration services on equipment from variety of applications for specific industries and lines of business. If you have a calibration need that is not listed in this area, please contact us.

Electrical

Micro Precision accredited electrical calibration lab services with multimeter, multifunction calibrator, oscilloscope, and power supply capabilities.

Learn More

Optical

Micro Precision accredited optical, light, and fiber optic calibration lab services.

Learn More

Chemical

Micro Precision accredited thermodynamic & chemical calibration lab services with temperature, humidity, life science, and pharma capabilities.

Learn More

RF - Microwave

Micro Precision accredited RF & microwave calibration lab services.

Learn More

Mechanical & Dimensional

Micro Precision accredited mechanical and dimensional calibration lab services with pressure, torque, force, flow, velocity, and aircraft jack load capabilities.

Learn More

Semiconductor

ANAB Accredited to ISO/IEC 17025-2017 Accredited semiconductor wafer thickness and precision step hight calibration.

Learn More

Calibration Needs. Simplified.

Full stack test equipment and instrument calibration services.

calibration-services

Calibration

Micro Precision offers on-site and worldwide instrument and equipment calibration services and solutions serving a broad range of industry sectors and applications.

Learn more

instrument-repair-services

Repair

Cost effective and efficient instrument repair services.

Learn more

global-calibration-solutions

Global Solutions

Providing technical and quality value added services, OEM support, and asset management solutions.

Learn more

equipment-sales-rental

Equipment Sales

Via our sister company Micro Precision Test Equipment Inc., we offer customers rental and leasing services, which gives our customers flexible options to meet ever-changing equipment needs.

Learn more

Services

Capabilities

Company

Resources

  • This field is for validation purposes and should be left unchanged.
anab logo
a2la logo
  • This field is for validation purposes and should be left unchanged.